{"product_id":"ags-construction-hse-policy-management-system-package","title":"Construction HSE Policy \u0026 Management System Package","description":"\u003cp\u003e\u003cem\u003eA general permit-to-work system, with the height and lifting permits, inspections and investigations a site has to be able to produce.\u003c\/em\u003e\u003c\/p\u003e\n\u003ch2\u003eOverview\u003c\/h2\u003e\n\u003cp\u003eOn a construction site the paperwork has to keep pace with the work: a permit raised before a job starts, plant checked before it is used, a contractor pre-qualified before it mobilises, and an investigation opened the day something goes wrong. This system documents the areas where that risk concentrates — site safety, PPE, permit to work, equipment safety, contractor management, emergency response, incident investigation, environmental protection, lifting operations and working at height — aligned to \u003cstrong\u003eISO 45001\u003c\/strong\u003e, the occupational health and safety management standard, and to local regulatory HSE codes.\u003c\/p\u003e\n\u003cp\u003eThe detail is operational and written to be used on site. Permits are raised, worked under and closed out. Plant is checked before use and kept out of service when it fails. Contractors are pre-qualified on HSE grounds before they mobilise, the day starts with a documented site safety inspection, and PPE is issued, fitted and acknowledged. Drills are run and reported, incidents are examined at the scene and captured on a single notification and investigation report, and spills are contained under a defined response. RAMS requirements, toolbox talks and stop-work authority are built into the wording, and leading and lagging safety indicators sit beside a scored risk register for each area.\u003c\/p\u003e\n\u003ch2\u003eWhat this system covers\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003ePermit to work — a general permit applied for, worked under and closed out.\u003c\/li\u003e\n\u003cli\u003eWorking at height and lifting operations — scaffolds and harnesses, lifting plans, and safe slinging and signalling, each with its own permit and inspection.\u003c\/li\u003e\n\u003cli\u003ePlant and equipment safety — pre-use inspection that keeps unfit plant out of service.\u003c\/li\u003e\n\u003cli\u003eContractor management — HSE pre-qualification before mobilisation, and control of contractors on site.\u003c\/li\u003e\n\u003cli\u003eEmergency response — alarm and evacuation, drills, and the report that proves they happened.\u003c\/li\u003e\n\u003cli\u003eIncident investigation — scene investigation, notification and a single investigation report.\u003c\/li\u003e\n\u003cli\u003eEnvironmental protection — site environmental inspection, and spill response and containment.\u003c\/li\u003e\n\u003cli\u003eDaily site safety and PPE — documented site inspection, PPE issue, fitting and acknowledgement.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2\u003eWho it's for\u003c\/h2\u003e\n\u003cp\u003eThis is a contractor's system. HSE managers, project directors and the safety consultants working alongside them use it when a tender demands a documented HSE system, when an ISO 45001 audit is scheduled, or when several sites are each running to a different standard. The result is a site safety framework supervisors can work to and auditors can follow.\u003c\/p\u003e","brand":"Apex Global Solutions AGS","offers":[{"title":"Default Title","offer_id":56792708677972,"sku":"AGS-01-024","price":790.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1052\/4996\/4372\/files\/AGS-01-002_Construction_HSE_Policy.png?v=1786639546","url":"https:\/\/agskits.com\/products\/ags-construction-hse-policy-management-system-package","provider":"Apex Global Solutions","version":"1.0","type":"link"}